Connect with us

Hi, what are you looking for?

Investing

Battery-Grade Lithium Carbonate Produced from McDermitt

Jindalee Lithium Limited (Jindalee, the Company) is pleased to announce that battery-grade lithium carbonate has been successfully produced from ore from the McDermitt Lithium Project (the Project) (Figure 1). This marks an important milestone, with all steps of the processing flowsheet for the Project from ore beneficiation and leaching to purification and production of battery-grade lithium carbonate now validated (Figure 2).

HIGHLIGHTS:Production of Battery-Grade Lithium Carbonate marks a major milestone with all steps of the McDermitt flowsheet now validatedFlowsheet for McDermitt is very similar to Lithium Americas’ Thacker Pass Project currently under construction 30km to the south of McDermittResults will support the PFS, due for release in Q4 CY 2024

These findings, together with other recently identified value optimisation opportunities, will be incorporated in the Pre-Feasibility Study (PFS) currently underway and due for completion Q4 2024.

Jindalee’s CEO Ian Rodger commented:

‘The successful production of battery-grade lithium carbonate from McDermitt ore is a major milestone for Jindalee. This achievement substantially de-risks our processing flowsheet and demonstrates the potential for McDermitt to supply high-quality lithium chemicals to the expanding US battery value chain.

We have been greatly encouraged by the exceptional results we have achieved since commencing the PFS metallurgical test work program with Fluor and Hazen in mid-2023 and anticipate that these results will meaningfully support the outcomes of the McDermitt Lithium Project PFS which is now due for release in Q4 CY 2024.”

Discussion

After investigating various alternatives, in March 2023 acid leaching with beneficiation (see Figure 2) was selected as the preferred flowsheet for the Project2. This decision followed a review of prior test work and high-level benchmarking of five comparator lithium projects by the global engineering, procurement, construction and maintenance company Fluor Corporation (Fluor), which indicated that acid leaching with beneficiation was expected to produce the best economic outcome for the Project. The resultant McDermitt flowsheet (Figure 2) is very similar to that utilised and extensively validated by Lithium Americas Corporation (TSX: LAC) at its Thacker Pass project, which is currently under construction and is also located in the McDermitt Caldera (~30km south of the McDermitt Lithium Project).

Fluor was subsequently appointed as lead engineer for the McDermitt PFS in June 20233, including managing an extensive bench scale metallurgical test work program at Hazen Research Inc. in Colorado, USA, aimed at validating the preferred flowsheet and providing data to inform the PFS (PFS Test Work). To date Jindalee has announced exceptional results from the McDermitt PFS Test Work including results from beneficiation test work in November 20234 and acid leaching in January 20245. Respective highlights include:

Beneficiation: Beneficiation of a composite sample of McDermitt ore using attrition scrubbing (250μm cut-size), recorded 92.0% Li recovery with 25.3% mass rejection, demonstrating the excellent potential to remove acid consuming material and increase the Lithium grade of leach feed4.Acid Leaching: Excellent lithium (Li) extraction rates were achieved from sulphuric acid leaching of beneficiated McDermitt ore. Li extraction from composite samples averaged 93% (250μm) and 94% (75μm) using 500kg sulphuric acid per tonne of leach feed5.

Subsequent to the acid leaching test work described above, an additional 300 kg composite sample (250 µm, comprising Units 4, 6, 8, and 10) was leached, yielding lithium in solution (leachate) for downstream test work (post-leach process steps – see Figure 2). The purification of the lithium-rich solution was successfully completed, resulting in the first production of battery-grade lithium carbonate, assaying 99.8% Li₂CO₃ with acceptable levels of deleterious elements in accordance with a typical third-party contract specification. This achievement significantly de-risks the Project by demonstrating the effectiveness of all process steps of the flowsheet at bench scale. Reaching this milestone provides strong validation of the flowsheet developed for McDermitt.


Click here for the full ASX Release
This article includes content from Jindalee Lithium, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

This post appeared first on investingnews.com

Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.






    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    You May Also Like

    Investing

    Overview Rua Gold (CSE:RUA,OTC:NZAUF,WKN:A4010V,OTCQB:NZAUF) is a gold exploration company focused on two prolific, historic gold-producing regions in New Zealand: Hauraki Goldfield and Reefton Goldfield....

    Economy

    The Israel Defense Forces (IDF) announced the death of Fuad Shukr, the Hezbollah commander who was behind a drone strike that killed 12 children...

    Latest News

    Two men kiss on a Parisian bridge. The camera later jumps to a trio embracing passionately in a room, before the door shuts. These...

    Editor's Pick

    President Biden found himself in a growing political crisis Wednesday as Democrats on Capitol Hill, the high-dollar donor community and even members of his...

    Disclaimer: wisetradeinvesting.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.


    Copyright © 2024 wisetradeinvesting.com